Installations

In January 2015 ANM succeeded in obtaining the Klargester/Kingspan accreditation. It took a lot of work to gain and many installations were needed to prove to this established manufacturer of sewage treatment plants and pump stations that ANM were the right company to offer and install their products. The relationship between our 2 companies continues to grow and really is now becoming one of main areas of our business.

With the 2020 Binding Rules for the discharge of Septic Tanks to open water courses, We at ANM are finding that this is now becoming more and more widely known but we are still finding clients that are unaware of this. As of the 1st January 2020 you are no longer allowed to discharge the outflow from a septic tank to an open water course, you have only 2 options and that is to either replace your existing system with a packaged sewage treatment plant conforming to BS EN 12566 or you will have discharge the effluent to drainage field conforming to BS 6297:2007.

We at ANM can help new clients with both options from the early stages of carrying percolation tests for a new drainage field or correctly sizing a sewage treatment plant based on the British Water Flows and Loads 4 guidelines.

Easy checklist to see if your existing system conforms to the General Binding Rules

General Binding Rules for the Discharge of Effluent to Ground

General Binding Rules for the Discharge of Effluent to Ditches and Open Watercourses

Being an independent family run business means we have the support of many manufacturers of sewage treatment plants and during our site visits we will recommend the most suitable option for your needs.

Please view our Case Studies to view some of our recent Klargester/Kingspan installations

lg1 lg2 lg3 lg4 lg5 lg6 lg7
Logo Img