Klargester BioDisc Installation – Uxbridge

This BioDisc Sewage Treatment Plant installation was in a very wet area, the property was surrounded by rivers and lakes. ANM were called in as an accredited installer of Klargester/Kingspan products to carryout the project and install the BioDisc. Part of the project was connecting two sewage pump stations and excavating and laying new foul drain runs around the property and into the Klargester BioDisc. The final effluent discharge was via a 50mm MDPE rising main into the river that run through the property. Throughout this installation we continually had one 3″ water pump and one 4″ water pump running.

lg1 lg2 lg3 lg4 lg5 lg6 lg7
Logo Img